The wastewater treatment plant from Buzau is located in the eastern part of the town in the vicinity of Buzau river and it was built in 2 stages: between 1964-65 and 1975-76.
With the aim of achieving the quality parameters imposed by EU's regulations, the company Veolia Water Solutions & Technologies Romania designed and built for RAM Buzau a project of refurbishment of the wastewater treatment plant. The new project benefits from the most advanced technology and new equipment thus ensuring that its performance surpasses the required standards.
The plant was designed for a flow of 46,000 m3/day and a treatment capacity of 235,000 P.E.
The refurbishment of existing works included the up-grading of the whole treatment line, namely: