We are honored to invite you to a tour of our achievements:
Case studies
Case studies
NEW - ARCUDA DWTP - SLUDGE TREATMENT ( WORK IN PROGRESS )
In order to continue the modernisation of Arcuda Drinking Water Treatment Plant, Apa Nova Bucuresti concluded a contract with the association Veolia Water Solutions and Technologies - Triada Prod Impex for the design, the execution, the installation and the commissioning of a Sludge Treatment Plant. The Contract duration is 36 months and the value is 33,886,629 lei (7,971,636 euros). The Veolia Water Solutions and Technologies part is 74.88% of the Contract value.
More information available here.
NEW - MEDIAS DWTP ( WORK IN PROGRESS )
Veolia Water Solutions & Technologies Romania has signed this November 2010 a contract of 42.8 Million RON / approximately 10 Million Euro for the refurbishment of a drinking water treatment plant for the local water operator of the city of Medias.
For more deatils click here.
Baia Mare WWTP
After 36 months work, Thursday, 7th of October 2010 took place, the inauguration of Baia Mare wasted water treatment plant located in the county of Maramureş (Romania).
For details click here.
Baia Mare DWTP
Baia mare DWTP was first inaugurated in 1967. The rehabilitation project of Baia Mare DWTP was begun by SC OTV FRANCE , member of Veolia Water Solutions & Technologies, in September 2006, and finalised in September 2009.
For more details click here.
Buzau WWTP
The wastewater treatment plant from Buzau is located in the eastern part of the town in the vicinity of Buzau river...
More details here.
Soufflet Malteries WWTP - Buzau
Soufflet Waste Water Treatment Plant is located in the eastern part of Buzau industrial area, inside the malt factory of Buzau.
In order to fullfill the parameters imposed for industrial effluents discharge into natural receptors, Veolia Water Solutions & Technologies Romania realized the WasteWater Treatment Plant for Soufflet Malteries. The project is a design and built of a treatment plant specifically adapted to this type of influent, using best suitable technologies, in order to comply with NTPA001 normes for discharge of the treated water into Buzau river.
For more information, click here.
Crivina DWTP
The Crivina treatment plant was originally constructed with a capacity of 3 m³/s and a spare capacity up to 6 m³/s. It was a part of an overall plan including Rosu treatment plant, a dam and storage reservoir on Arges River and a raw water aqueduct between the dam and Crivina plant. A treated water aqueduct was constructed to transit the water from Crivina plant to the Bucharest distribution system...
For details click here
Rosu DWTP
Rosu, a 30 years old Drinking Water Treatment Plant, i ready to comply with both the EU and Romanian standards. Veolia Water Solutions & Technologies Romania conceived and constructed for Apa Nova Bucharest several modern installations for the coagulation-flocculation-sedimentation process.
For details click here.
Arcuda DWTP
Built in 1900, Arcuda Drinking Water Treatment Plant has a treatment capacity of 750 000 cm/day and is equipped with 42 rapid sand filters from which 26 have concrete slabs floor with nozzles...
For details click here.